ASIC Design Flow
Specification → RTL → verification → synthesis → floorplan → place and route → timing/power signoff → DRC/LVS → tape-out.
Advanced
Open-source flows (OpenLane) and shuttles make student tape-outs possible.
Spotted a mistake or want to add detail? Suggest an improvement — Content Contributors' edits are reviewed by editors before they go live.
Discussion (0)
Sign in or join free to ask questions and discuss this topic.